2011 Plan: Population and Water Demand Projections
Preferred Steam Electric Demands:
4/30/08 - DRAFT report "Water Demand Projections for Power Generation in Texas" Report (1.5 MB) 6/17/08 - Brazos G comments on report (1.5 MB) 8/30/08 - FINAL report "Water Demand Projections for Power Generation in Texas" Report (1.8 MB) 4/7/09 - INITIAL Memo: Preferred steam-electric water demands to complete the 2011 Brazos G RWP 4/21/09 - Letter and attachments to County Judges (5.4 MB) Comments Received (161 KB) 5/08/09 - Tenaska 5/14/09 - Optim Energy, LP 5/14/09 - Wolf Hollow 5/15/09 - AEP Verbal - TMPA - no changes to projections 6/30/09 - FINAL Memo: Preferred steam-electric water demands to complete the 2011 Brazos G RWP
Revised Population Projections:
01/08/09 - Suggested Population Projections for the 2011 Brazos G Regional Water Plan Memo (71KB) Final 2006 and Proposed 2011 Population Projections (171 KB) 01/26/09 - TWDB Response (14 KB) TWDB Email attachments: WUG comments (12 KB) TWDB Evaluation: Region G Population Projections (126 KB) 01/27/09 - HDR Response to TWDB (394 KB) 02/12/09 - Suggested revisions to specific population projections to be used in the 2011 Plan - Memo (58 KB) 03/10/09 - Letter to TWDB - Recommended revisions to specific population projections to be used in the 2011 Brazos G Regional Water Plan (1.5 MB) 03/20/09 - TWDB Response - Recommended revisions to specific population projections to be used in the 2011 Brazos G Regional Water Plan (271 KB)
|