2011 Plan: Population and Water Demand Projections


Preferred Steam Electric Demands:

4/30/08 - DRAFT report "Water Demand Projections for Power Generation in Texas" 
   Report (1.5 MB)
6/17/08 - Brazos G comments on report (1.5 MB)
8/30/08 - FINAL report "Water Demand Projections for Power Generation in Texas" 
   Report (1.8 MB)
4/7/09 - INITIAL Memo: Preferred steam-electric water demands to complete the 2011 Brazos G RWP
4/21/09
- Letter and attachments to County Judges (5.4 MB)
Comments Received (161 KB)
     5/08/09 - Tenaska
     5/14/09 - Optim Energy, LP
     5/14/09 - Wolf Hollow
     5/15/09 - AEP
     Verbal -    TMPA - no changes to projections
6/30/09 - FINAL Memo: Preferred steam-electric water demands to complete the 2011 Brazos G RWP


Revised Population Projections
:

01/08/09 - Suggested Population Projections for the 2011 Brazos G Regional Water Plan Memo (71KB)
Final 2006 and Proposed 2011 Population Projections (171 KB)
01/26/09 - TWDB Response (14 KB)
     TWDB Email attachments:
          WUG comments (12 KB)
          TWDB Evaluation: Region G Population Projections (126 KB)
01/27/09 - HDR Response to TWDB (394 KB)
02/12/09 - Suggested revisions to specific population projections to be used in the 2011 Plan - Memo (58 KB)
03/10/09 - Letter to TWDB - Recommended revisions to specific population projections to be used in the 2011 Brazos G Regional Water Plan (1.5 MB)
03/20/09 - TWDB Response -  Recommended revisions to specific population projections to be used in the 2011 Brazos G Regional Water Plan (271 KB)